Case Studies
Tubulars Case Studies
Don Valley Viaduct - Van Elle
Our client Van Elle won the work to install piles that would form part of a new shock absorber anchorage system that would allow the Don Valley Viaduct to remain in use for many years.
For this bank stabilisation project, we supplied 117 No. 339mm diameter Grade L80 steel Circular Hollow Section (CHS) piles which were cut to length and supplied from our Montrose facility.
The project, situated in Grangemouth, Scotland involves installing around 260 No. 508mm diameter steel tube piles to support varying structures as part of the new Energy from Waste centre.
The P&J Live Arena, Aberdeen’s state-of-the-art conference, exhibition and entertainment complex opened in 2019, boasts foundations made from oil and gas pipe and casing which have been repurposed and reused into piling posts.